Metro


  • Port Coogee Mar 28 12 276.jpg

    Port Coogee

    Residential Marina Development

    View Port Coogee Project Case Study
  • Computer generated image of potential development with built form. Image courtesy of LandCorp.

    Springs

    Rivervale

    View Springs Rivervale Project Case Study
  • CLARE-2012-03-19-Claremont-NEP---Artist-Impression-Overall-Aerial-View.jpg

    Claremont

    on the Park

    View Claremont on the Park Project Case Study
  • Belmontpark.jpg

    Belmont Park

    View Belmont Park Project Case Study

Regional


  • beachridge.jpg

    Beachridge Estate

    The Beachridge Estate development comprises 1000 residential lots. JDSi have completed design for Stages 7A and 9A with construction commencing shortly. We also provide Engineering input into future development areas for the Turquoise Coast Development which could see the population of Jurien increase from 1,200 to 25,000 people over the next 30 years.

    Beachridge Estate Website

  • Kununurra.jpg

    Valentine Falls

    Challenging site conditions at Valentine Falls required a close working relationship with the Shire of Wyndham East Kimberley to deliver practical solutions within our Clients' project budget. JDSi implemented alternative road and drainage engineering solutions to add significant value to the development. Construction for this development was completed in late 2011.

  • Karratha-Village-2.jpg

    Velocity Villages, Karratha

    JDSi undertook all design and documentation and responded to technical queries throughout the construction works for both developments by Velocity Villages. 'Velocity Village' comprises 92 luxury units located just 5km out of the Karratha town centre. 'Padbury Central' is a 28 lot development in the Karratha township which provides affordable housing options, including strata titled housing and land packages.

    Velocity Villages Website

  • collieoverview2.jpg

    Bluewater, Collie

    JDSi were engaged to complete a 300 man accommodation village at Bluewater within a tight timeframe. This project required optimising the village layout and providing a full set of documentation for construction, including earthworks, power, sewerage, water and fire water, arranging for geotechnical investigations and assisting in obtaining approvals from all relevant authorities.